• About Us
  • Lean Blog
  • OpEx Glossary
+1 317 818 2430
Kaufman Global
  • Why Kaufman?
  • Services
    • Operations Analysis
      • Business Recovery Playbook
      • Rapid Performance Evaluation
      • Analysis and Implementation Design (A&ID)
    • Implementation Projects
      • Lean Manufacturing
      • Lean Office | Office Kaizen
      • Operational Excellence
    • OpEx Training
      • Lean Leadership®
      • Lean Training
    • Lean Workshops
      • Leadership Workshops
      • Kaizen Events
      • Lean Layout and Facility Design
    • Methods
      • Lean Daily Management System
      • Procedural Adherence
      • The 20 Keys
      • SLIM-IT ® Implementation Model
  • Our Results
  • Resources
    • White Papers
    • Glossary
  • Contact
  • Menu Menu

The Lean Daily Management System Part 4 | The 20 Keys

by Sean Wright

What if every workgroup within your enterprise could develop and manage its own improvement plan?

Description: In the Lean Daily Management System (LDMS) post Part 4, we’ll move on to take a look at the 20 Keys (LDMS framework inset20 Keys right). Applying the 20 Keys helps individual workgroups evaluate and understand their own performance, then develop a structured long-term improvement plan for their specific situation (20 Keys cycle inset below). While leadership or third-party resources often help with an initial assessment, many believe that the fact that 20 Keys becomes a self-assessment — that is, the keys are evaluated and acted upon by a workgroup who rates and pushes themselves — is likely to be the most important aspect in its success through compelling buy-in and ownership. Moreover, the plain language quality of the keys means that the key’s level-descriptions really can’t be gamed; something simply doesn’t smell right when reality and numbers don’t track.

About the Process: Utilizing 20 Keys is intuitive. It depicts op20 Keys Assessment Cycleerational or functional work areas (ex.: manufacturing or materials management) in 20 “key” elements (ex.: error-proofing or problem-solving) whose descriptions reflect steps toward world-class performance benchmarks. For each key, five performance ranks are described in plain language beginning with a Level 1 – Traditional through Level 5 – Currently Invincible (table inset below).

20 Keys LevelsCompleted 20 Keys data packs consist of: a chart mapping goal attainment; a corresponding set of point or level descriptors for individual keys; and, a workgroup devised and maintained action plan detailing who does what by when in order to achieve workgroup improvement aims. Overall, a starting point is no less than 20 points (1 point earned for “traditional” in each key) and 100 points is the maximum achievable. Improving 10 points per year in early years is doable. Workgroups having achieved 60 points tend to look and feel fantastic and are quite high-functioning. Although it can happen, we don’t encounter many workgroups over the low 80s.

The graphic (inset below) depicts a 20 Keys chart for a manufacturing cell where the current score (squares) is 30 out of 100. Triangles represent the workgroup’s improvement goals for the individual keys they’ve selected to improve at this time for a 40-point total targeted within six months. A key-by-key improvement plan (not shown) is prepared listing the specific tasks required by workgroup members to attain the point goals.

20 Keys Lean Manufacturing chartIn order to level-set, monitor and review continuous improvement progress, there’s no better approach than Kaufman Global’s 20 Keys®, a proprietary method focusing intact workgroups on the vital dimensions of how it operates versus world-class benchmarks. Transcending both language and culture, organizations worldwide have implemented 20 Keys with sustained success. Kaufman Global has developed over 25 different sets of keys applicable to operational and functional settings, including Customer Service, Supply Chain Management, Engineering and Project Management. Regardless of which sets are used, 20 Keys relays a standard approach to evaluate and improve performance effectiveness throughout your enterprise.

Next Time

Thanks for your attention to this 20 Keys summary! In Part 5, we’ll cover Short Interval Coaching. In the meantime, if you’d like to start your LDMS workgroups off right – or, if you’ve already started and you aren’t getting the expected results, we can help course correct. Kaufman Global offers you: deep, real-world experience, world-class coaching and training at all levels, a rich array of intellectual property, learning materials, and Train-the-Trainer Certification programs all focused on solving actual performance problems so you get a business result while creating organization capability. For immediate attention, don’t hesitate to reach out.

Tags: 20 Keys, LDMS, workgroup
https://www.kaufmanglobal.com/wp-content/uploads/2017/06/greenblock.jpg 832 800 Sean Wright https://www.kaufmanglobal.com/wp-content/uploads/2017/05/kaufman_global_logo-1-1-1.png Sean Wright2020-01-29 12:36:452021-02-02 10:48:46The Lean Daily Management System Part 4 | The 20 Keys
You might also like
Continuous Improvement And The 20 Keys®
World-Class Performance and the 20 Keys
5 Critical Success Factors for Evaluating Operational Performance
Performance Level Examples

Enjoying our glossary? You can link directly to it with this url:

https://www.kaufmanglobal.com/glossary/

 

Join our email list –  we send a short OpEx article each month. To be added, drop a note to: hello[at]kaufmanglobal.com

 

Recent Posts

  • Strategic Partnership: Skovinen and Kaufman Global
  • Kaufman Global 2022 Accomplishments
  • Use the Trust Equation to Make Better Decisions
  • Why Is It So Tough to Be Lean in a Relationship-centric Organization?
  • Manufacturing Footprint Analysis
© Copyright Kaufman Global 2026
  • Link to LinkedIn
  • Link to Mail
  • Link to Rss this site
  • Terms of Use
  • Contact
Link to: LDMS Part 3 | Kaizen Action Sheets (KAS) System Link to: LDMS Part 3 | Kaizen Action Sheets (KAS) System LDMS Part 3 | Kaizen Action Sheets (KAS) System Link to: There are 9 Wastes in the Lean Waste Wheel Link to: There are 9 Wastes in the Lean Waste Wheel There are 9 Wastes in the Lean Waste Wheel
Scroll to top Scroll to top Scroll to top